| Path | Off-peak | Peak, Oct to Dec |
|---|---|---|
| FBA, delivered to FC → sellable | 3 to 7 days | 7 to 21 days, plan 14 |
| AWD, delivered → received | 3 to 7 days | 5 to 10 days |
| AWD → FBA replenishment | 7 to 14 days | 10 to 14 days |
| AWD total, delivered → sellable at FBA | ~2 weeks | ~3 to 4 weeks |
AWD is slower end to end, but you control when the clock starts. AWD is a lever. FBA direct is a bet.
Days from first check-in scan until 95% of a shipment's units are sellable, 95th percentile. Typical case is about one day all year. The tail is what breaks plans: August 4 days, December 12. At p99, December is 70.
| Event | When it runs | Sellable by |
|---|---|---|
| Prime Big Deal Days | Early October 2026 | Sep 25, 2026 |
| Black Friday & Cyber Monday | Nov 27 to Nov 30 | Nov 6, 2026 |
| Christmas | Dec 25 | Dec 4, 2026 |
Sellable means checked in and buyable, not shipped, not delivered. Every date on this slide already has the check-in leg baked in.
| Leg | Days | Running total |
|---|---|---|
| Production | 30 or 60 | 30 / 60 |
| Cargo ready to vessel departs | 7 | 37 / 67 |
| On the water | 30 | 67 / 97 |
| Port, drayage, FC door | 7 | 74 / 104 |
| Delivered to sellable, peak check-in | 14 | 88 / 118 |
Nothing here is aggressive. This is the good version, with no delays.
| Milestone | Date | Status |
|---|---|---|
| Sellable at FBA | Nov 6, 2026 | |
| Delivered to FC | Oct 23, 2026 | |
| Out of port | Oct 20, 2026 | |
| Vessel arrives | Oct 16, 2026 | |
| Vessel departs China | Sep 16, 2026 | 3 weeks out |
| Cargo ready | Sep 9, 2026 | 2 weeks out |
| PO placed, 30-day production | Aug 10, 2026 | 17 days ago |
| PO placed, 60-day production | Jul 11, 2026 | 47 days ago |
If you are planning Black Friday inventory today, the plan is already wrong, and no amount of forecasting fixes it. Everything left is triage, not a plan.
| Production time | Safe PO date | Cargo ready |
|---|---|---|
| 60 days | Nov 10, 2026 | Jan 9, 2027 |
| 30 days | Dec 10, 2026 | Jan 9, 2027 |
The last realistic cargo-ready date is about January 22. Ports are jammed for two weeks before that, so aim for January 9 and keep the difference as buffer.
Whatever you have on hand at New Year has to carry you to late March. Miss the pre-CNY window and it has to carry you to late May.
If cover is less than resupply, you are going to zero. Slow down now, on purpose.
Target velocity = on hand / days to resupply Slowdown needed = 1 - (target / current) PPC cut needed = slowdown / PPC share
| On hand | 400 units |
| Selling | 12 per day |
| Cover | 33 days |
| Next shipment sellable | 60 days |
| Target velocity | 6.7 per day |
| Slowdown needed | 44% |
| PPC drives | 50% of units |
| PPC cut needed | 89% |
Above 100% and ads alone cannot save it, so you raise price too. Here 89% leaves no headroom: cut bids hard and raise price.